火范文>英语词典>consignments翻译和用法

consignments

英 [kənˈsaɪnmənts]

美 [kənˈsaɪnmənts]

n.  装运的货物; 运送物; 发送; 投递; 递送
consignment的复数

柯林斯词典

  • N-COUNT 运送的一批货物
    Aconsignment ofgoods is a load that is being delivered to a place or person.
    1. The first consignment of food has already left Bologna.
      运送的第一批食品已经离开了博洛尼亚。

双语例句

  • I want you to see for yourself how our consignments are cleared in London.
    我要你亲自去看看我们的货物在伦敦是怎样结关的。
  • The Consignee must try to sell the consignments at the best possible prices after obtaining the approval of the Consignor as to price, terms, etc.
    代售人在征得寄售人对价格、款等到同意之后,必须尽力以最好价格出售寄售商品。
  • The blouses will be delivered in two consignments of 60,000 pieces each.
    这些女衫将分两批交货,每批六万件。
  • We have seized other consignments of counterfiet goods including Bafana Bafana shirts but not of this magnitude.
    我们也曾缴获过其他的假冒商品,其中包括BafanaBafana衬衫,但是数量没有这么大。
  • Their furniture will stay in the warehouse until they have paid the storage fee. We sometimes keep our consignments in bond under the control of the customs.
    他们要等交了保管费之后才能把家具搬出货栈。我们有时把货物贮存在关栈中,由海关监管。
  • We are starting to see consignments of two or three items a week, instead of one, he says.
    我们现在每周有两到三件寄卖品,而不止一件,他说。
  • When the port facilities are to be replaced and reconstructed, the wharves for loading/ unloading bulk goods should be furnished with complete sets of high-efficiency specialized equipment and with advanced loading/ unloading technology provided that the flow of consignments remains steady all the time.
    在港口建设与原有码头改造时,在货源稳定,吞吐任务量适当时,散货码头应采用高效率的专用配套设备,装卸工艺应力求先进;
  • That requires them to check consignments considered high-risk, for example from a little-known company or originating in parts of the Middle East.
    这项倡议要求它们检查被视为高危险的货物,譬如来自一家不知名公司或来自中东某处的货物。
  • This kind of trade is advantageous as it may save cost, time and trouble that comes from dealing in large consignments.
    寄售贸易方式有其独特的优点,它节省费用、时间,避免不必要的麻烦。
  • They will be delivered in two consignments of 60,000 each, the first by August 20 and the second by September 10. The goods must be delivered on schedule.
    分两批交货,每批六万件,第一批八月二十日交货;第二批九月十日交货。这批货物必须按期交。