excavating
英 [ˈekskəveɪtɪŋ]
美 [ˈekskəveɪtɪŋ]
v. 发掘,挖出(古建筑或古物); 挖掘,开凿,挖空(洞、隧道等)
excavate的现在分词
现在分词:excavating
柯林斯词典
- VERB 发掘,挖掘(古物等)
When archaeologists or other peopleexcavatea piece of land, they remove earth carefully from it and look for things such as pots, bones, or buildings which are buried there, in order to discover information about the past.- A new Danish expedition is again excavating the site in annual summer digs.
一支新的丹麦探险队又在那个遗址上进行一年一度的夏季挖掘。
- A new Danish expedition is again excavating the site in annual summer digs.
- VERB 挖;开凿
Toexcavatemeans to dig a hole in the ground, for example in order to build there.- A contractor was hired to drain the reservoir and to excavate soil from one area for replacement with clay.
雇了一个承包商抽干水库的水,挖掉一个区域的泥土后再用黏土填上。
- A contractor was hired to drain the reservoir and to excavate soil from one area for replacement with clay.
双语例句
- Construction Methods for Rotary Excavating Drilling Machine for Pile Foundation of Weak Geological Layer We use drilling hole detection, excavation eye-measurement and geological analysis technique to survey the pipe network.
软弱地质层桩基旋挖钻机钻孔施工工法本文论述了钻孔探测法、开挖目测法及地质分析法对埋地煤气管网进行全面的普查。 - Application of long-hole loose controlled blasting technique in excavating consequent bed cutting slope
深孔松动控制爆破技术在顺层路堑边坡开挖中的应用 - Application of the Rock and Soil Monitoring Technique on the Deep Pit Excavating Engineering
岩土监测技术在深基坑开挖工程中的应用 - Application of Smooth Blasting Technique in Engineering of Excavating Tunnel in Soft Rock Area
光面爆破技术在软岩地区隧洞开挖工程中的应用 - A tool or machine used for digging or excavating.
用于挖掘或采掘的工具或机器。 - Design calculating method and application for excavating mechanism with three hinge points linkage
三铰点连杆挖掘机构的设计计算方法与应用 - They are excavating a tunnel through the hill.
他们在挖一条穿山隧道。 - In the construction, the first supporting and then excavating excavation way should be adopted.
施工中应采用“先撑后挖”的开挖方式; - Treatment and intelligent recognition of photo of tunnel excavating face with new Austrian tunneling method;
为此,本文提出将随机有限元法和神经网络相结合,进行传热参数的智能辨识。 - The accumulative damage range of surrounding rock is mainly determined by the blasting of excavating face of pilot tunnel I which is parallel to it.
侧壁围岩的累计损伤范围主要由与其齐平的导洞I的开挖掌子面爆破决定;