火范文>英语词典>slipway翻译和用法

slipway

英 [ˈslɪpweɪ]

美 [ˈslɪpweɪ]

n.  (造船或修船的)船台,滑台,滑道

复数:slipways 

BNC.34434 / COCA.45822

牛津词典

    noun

    • (造船或修船的)船台,滑台,滑道
      a sloping track leading down to water, on which ships are built or pulled up out of the water for repairs, or from which they are launched

      柯林斯词典

      • 船台(船只下水用的滑道)
        Aslipwayis a large platform that slopes down into the sea, from which boats are put into the water.

        英英释义

        noun

        • structure consisting of a sloping way down to the water from the place where ships are built or repaired
            Synonym:waysshipway

          双语例句

          • Qualitative analysis of water level at slipway end for ship longitudinal air cells 'launching
            船舶纵向气囊下水工艺船台末端水位定性分析
          • This paper briefly introduced the key technique in the construction process of big-diameter and super-depth Cast-in-Situ pile for the8000T block slipway of Tanggu basement.
            简要介绍在塘沽基地8000T级组块滑道工程大直径超深灌注桩施工过程中的关键技术。
          • At present, up to slipway longitudinally is widely used in the large or middle shipyards. There are accidents that the ship bottom structure and slipway are damaged during the process of up to slipway all over the world.
            目前船舶纵向上排是大、中型船厂广泛采用的一种上排方式,但在国内和国外的船舶上排过程中船底和船台结构时有受损的事故发生。
          • The longitudinal launching of large ships from slipway is a process incorporating complicated technology and numerous accident possibilities.
            万吨级船舶在纵向倾斜船台上下水是一个技术复杂且事故因素较多的工艺过程。
          • The Problem of Temporary Sealing of the Underwater Reinforced Concrete Caisson for Half-dock-type Slipway
            关于半坞式船台水下钢筋混凝土沉箱的临时止水问题
          • Based on this slipway arrangement the paper studies and analyzes the longitudinal launching technique for the. 1 718 TEU container ship.
            本文就这一船台布置方案,对1718TEU集装箱船纵向下水进行研究分析。
          • After analyzing the shortage of traditional method of time-resource optimization, this paper applies ( software P3) to the hull-block slipway assembling project. It is proved that the software is more flexible on time-resource ( optimization).
            分析传统工期-资源优化方法的不足,提出应用P3软件进行资源优化,将其运用到船台大合拢分段吊装计划管理中,证实了该软件在资源优化方法上具有一定的多样性和灵活性。
          • Effect of Status Parameters of Slipway and Hull on Motion of Ship Launching
            船台及船体各状态参数对船舶下水运动的影响
          • Shipwright has the slipway, wood seasoning stores and manpower needed to build ships for a strong fleet.
            船坞拥有建造大型船舶所必需的船台、木料仓库和足够人力。
          • Brief Introduction of Design and Construction of High-piled Slipway
            高桩滑道工程的设计、施工简介